How to Get Your House Naksha Passed in Nepal
The naksha pass process involves drawings, land documents and local authority checks. This guide outlines common preparation steps and issues to discuss with your registered designer or engineer before submitting an application.

In Short
- Naksha pass is the municipality's approval of your house drawings. You must have it before construction.
- Start with land documents, hire a licensed architect or engineer, then apply at your municipality or ward.
- Most rejections are caused by setback errors, incomplete land papers, or drawings that break local rules.
In This Article
What is naksha pass?
Naksha means map or drawing. A naksha pass is the official approval from your local government (municipality or rural municipality) that your building design follows local bylaws and the National Building Code. It is also called a building permit. Without it, your house is treated as unauthorised.
Rules differ from place to place
Steps, fees and time can be different in each municipality, and many now have online systems. Treat this guide as a general map and confirm details with your own ward office.
Step-by-step process
- 1
Check your land documents
Make sure your lalpurja (ownership certificate) is in your name, land tax (malpot) is paid up to date, and you have the land map (blueprint) from the survey office.
- 2
Learn the local bylaws
Ask the ward or municipality about setback, road width, ground coverage, floor area ratio and height limits for your plot.
- 3
Hire a licensed architect or engineer
They will prepare architectural drawings, structural design, and electrical and plumbing plans that meet the National Building Code.
- 4
Prepare the documents
Usually: land ownership copy, land tax receipt, land map, citizenship copy, drawings and design reports, and the designer's professional details.
- 5
Submit the application
Apply at the municipality office or through its online system and pay the required fees.
- 6
Technical review and site inspection
Municipal officers check the drawings and may visit the plot to verify boundary, road and setback.
- 7
Fix comments and receive approval
If the office asks for corrections, update the drawings and resubmit. After approval you receive the permit and stamped drawings.
- 8
Build exactly as approved
Keep the approved drawings on site. Many municipalities inspect at plinth or DPC level, so do not continue upward without required clearance.
Why applications get rejected
- Setback from road, river, boundary or high-tension line is not respected
- Road width shown in drawings does not match reality
- Building covers more of the plot than allowed
- Land papers are incomplete, outdated or in a different name
- Drawings or structural design are unsigned or do not follow the code
- Plot overlaps public land, riverbank or disputed boundary
Do not start digging early
Starting construction before approval can lead to fines, a stop-work notice, and problems with loans, electricity connection and later selling. Wait for the permit.
How to make it faster and smoother
- Choose a designer who has worked with your municipality before
- Visit the ward office early to confirm road width and setback
- Keep photocopies and digital scans of every document
- Follow up politely and respond to comments quickly
Naksha documents checklist
- Lalpurja (land ownership certificate)
- Updated land tax (malpot) receipt
- Land map / blueprint
- Citizenship certificate copy
- Architectural and structural drawings
- Designer's registration details and signature
- Application form and fee receipt

Need help with Building Approval & Documentation?
Assistance with municipal permits and construction documentation. Explore the service or submit a booking request for your project.
Explore Building Approval & DocumentationImportant: This article is provided for general information and educational purposes. Construction costs, municipal procedures, approval requirements, timelines and technical requirements can vary by location and project. Always confirm current requirements with the relevant local authority and consult a qualified architect, engineer or other appropriate professional where necessary.